Soil In Construction (Assignment)

Chapter 9

Assignment

Please see complete illustration in text book

Soil in construction sixth edition Don C. Warrington W. L. Schroeder

 

1. Figure 9.21 is representative of soil conditions at a construction site. If you are the contrac-tor, select a dewatering method you would consider appropriate for each of the projects described below. Consider the information given in this chapter, earlier chapters and any other information that may be appropriate. Describe in detail how your system would be built and operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter and how you should plan for them. a. A circular reservoir 100 ft in diameter is to be built with a bottom slab 25 ft below present ground surface. The groundwater level must be held at least 2 ft below the slab until the reservoir is filled. b. A bridge pier with a driven pile foundation is to be built with the bottom of the pile cap 40 ft below present grade. The cap is 20 ft by 30 ft in plan view

 

2. 2. Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9.22. a. 1200 ft of an 18-in. sewer line is to be placed in a trench about 16 ft below ground surface. b. A 30-ft-diameter concrete pump station is to be founded on the basalt rock at 65 ft in depth. c. Conditions as in a, except that the pipeline is 28 ft below the ground surface.

 

 

Chapter 9

 

 

Assignment

 

Please see

 

complete

 

illustration

 

in

text

 

book

 

Soil in construction

sixth

 

edit

ion

 

Don C. Warrington

 

W. L. Schroeder

 

 

1.

 

Figure 9.21 is representative of soil conditions at a construction site. If you are the contrac

tor,

select a dewatering method you would consider appropriate for each of the projects described

below. Consider the information given in this chapter, earlier

 

chapters and any other

information that may be appropriate. Describe in detail how your system would be built and

operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter

and how you should plan for them. a. A circul

ar reservoir 100 ft in diameter is to be built with a

bottom slab 25 ft below present ground surface. The groundwater level must be held at least 2

ft below the slab until the reservoir is filled. b. A bridge pier with a driven pile foundation is to

be bui

lt with the bottom of the pile cap 40 ft below present grade. The cap is 20 ft by 30 ft in

plan view

 

 

2.

 

2. Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9.22. a.

1200 ft of an 18

in. sewer line is to be placed in a t

rench about 16 ft below ground surface. b. A

30

ft

diameter concrete pump station is to be founded on the basalt rock at 65 ft in depth. c.

Conditions as in a, except that the pipeline is 28 ft below the ground surface.

 

 

 

Chapter 9

 

Assignment

Please see complete illustration in text book

Soil in construction sixth edition Don C. Warrington W. L. Schroeder

 

1. Figure 9.21 is representative of soil conditions at a construction site. If you are the contrac-tor,

select a dewatering method you would consider appropriate for each of the projects described

below. Consider the information given in this chapter, earlier chapters and any other

information that may be appropriate. Describe in detail how your system would be built and

operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter

and how you should plan for them. a. A circular reservoir 100 ft in diameter is to be built with a

bottom slab 25 ft below present ground surface. The groundwater level must be held at least 2

ft below the slab until the reservoir is filled. b. A bridge pier with a driven pile foundation is to

be built with the bottom of the pile cap 40 ft below present grade. The cap is 20 ft by 30 ft in

plan view

 

2. 2. Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9.22. a.

1200 ft of an 18-in. sewer line is to be placed in a trench about 16 ft below ground surface. b. A

30-ft-diameter concrete pump station is to be founded on the basalt rock at 65 ft in depth. c.

Conditions as in a, except that the pipeline is 28 ft below the ground surface.

 

 

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)